π“Ÿ host1.bitchan.one

𓀐 @_y7G*YNj

⏱ 2d seenβ›“ 0πŸ‘ 0β§– 1

filter [-]

languages:onother

The Production and Assembly building in Wenchang has been in construction since early spring. It'll concentrate Tank/Structure production and individual stage assembly; It's about 63,000m2 with a High bay that's comparable in size to the Gigabay CASC targets a 2030 launch for the 3 stage variant (50t to TLI in partially reusable mode) but everybody agree it's optimistic⏱ 2d↩